Identify the component and its stage
Start with the drawing number and revision, part description, material specification, finished weight and intended application. State whether the offer covers a raw forging, a machined component or a finished assembly. Buyers cannot compare prices accurately when one offer includes machining and another stops at the forged blank.
Separate process assumptions
Explain the forging route and any assumptions that affect the quote, such as die or tooling responsibility, annual demand, batch size, material yield, machining allowance and packaging. If the buyer has not supplied an annual forecast, label the volumes used for pricing as quote assumptions rather than confirmed demand.
Agree what inspection means
Ask which dimensions and material properties must be checked, how often, and what records the buyer needs with each lot. Identify any heat-treatment, hardness, chemical analysis, non-destructive testing or third-party inspection requirements only when they apply to the component. State what your facility can perform and what would need an outside provider.
Show how changes will be controlled
Keep the drawing revision, approved sample, inspection plan and order specification linked. If the buyer issues a new revision, confirm its effect on tooling, process, validation and delivery before production starts. This prevents an outdated drawing from becoming the basis for a repeat order.
Present your capability clearly
Use a supplier profile to describe the forging types and materials you actually handle, available equipment range, machining options, inspection capability, location and export contact. Buyers can then send a relevant drawing and request a quotation for a defined component.
