Describe the issue with evidence

Record the product, model, drawing or specification revision, production lot and discovery date. State the requirement, observed result and inspection method. Include clear photos or measurements where useful, while protecting unrelated customer or worker information. Avoid conclusions before the evidence is reviewed.

Contain the affected scope

Identify which units, materials or shipments may be involved and how they are separated from accepted product. Tell the buyer what has shipped, what is on hold and which lots are still being checked. If the extent is unknown, state what additional inspection will establish it and when an update is expected.

Verify the corrective action

Record the likely cause only after investigation, then list the action, responsible owner and due date. Define how the change will be checked on the next production run and what record will demonstrate the result. A repaired lot and a process correction are different actions; make both visible when relevant.

Related guides

documenting product changes before bulk production

confirming buyer-specific packing requirements

Show your product scope and quality-contact process on an Asia Trade Directory supplier profile.